Base Line Alerting to be fail-over aware.

by Jun 15, 2017

Thinking of Always On Availability Groups (AG) and when using BaseLine Alerting. Following a fail-over of the AG the DM system should have an option to use the baseline from the previous Primary node until a local baseline can be developed. following a fail-over I am finding various alerts such as number of connected client and long running jobs, page-life expectancy which I believe are false positives and should not happen